Calculate how much concrete you need for slabs, circular pads, columns, piers, and post holes, including bags, weight, allowance, and optional cost.

Full Concrete Guide

Replace the example values with your project measurements.

Measurements

Typical yield: 0.60 ft³ (17.0 L) per bag · Check your product bag for exact yield.

Advanced options (optional)Add ready-mix delivery or bag pricing when needed.
Ready-mix pricing

Ready-mix pricing

Estimate concrete and delivery cost.

Bag pricing

Bag pricing

Estimate packaged concrete cost.

Planning your project? Read our concrete guide for material basics, measurement examples and buying advice.

Transparent methodology

How the concrete estimate is calculated

The Concrete Calculator turns the finished dimensions of a slab, circular pad, column, pier, or post hole into a material estimate. It normalizes the entered units, calculates the volume of one item, multiplies by quantity, and then applies only the allowance you select. The results keep the measured requirement separate from the practical amount to order.

  1. 1

    Choose the project

    Select a slab, pad, column, pier, or post hole.

  2. 2

    Enter measurements

    Use the finished dimensions of the concrete.

  3. 3

    Apply quantity

    Include repeated items with identical measurements.

  4. 4

    Add allowance

    Account for appropriate project variation.

  5. 5

    Compare purchasing

    Review ready-mix, bags, weight, and optional costs.

Rectangular projects use length × width × thickness. Circular projects use π × radius² before multiplying by depth or height. Imperial results convert cubic feet to cubic yards using 27 cubic feet per cubic yard; Metric inputs are converted to equivalent purchasing quantities.

Ready-mix is rounded upward to the next 0.1 cubic yard, while bag quantities round upward to whole bags using the selected package yield. Product yield and delivered density vary, so verify the final order with the bag label or ready-mix supplier.

Concrete volume basics

How many cubic yards of concrete do I need?

Cubic yards are the common purchasing unit for ready-mix concrete in the United States. Start with the finished project volume in cubic feet and divide by 27. For example, a project requiring 54 cubic feet has a measured volume of 2 cubic yards before allowance. The calculator performs this conversion automatically and also displays cubic feet, cubic meters, and liters for comparison.

Ordering exactly the measured volume can leave little room for uneven excavation, variation in forms, spillage, or placement loss. Select an allowance that suits the project, then review both the calculated requirement and recommended ready-mix order. The recommendation rounds upward to the next 0.1 cubic yard rather than hiding extra material inside the formula.

Supplier minimums and ordering increments can differ from the calculator's planning increment. Confirm the final cubic-yard quantity, mix specification, delivery terms, and any short-load charge with the ready-mix supplier before scheduling the pour.

Slab planning

How to calculate concrete for a slab

Measure the slab length and width inside the forms, then use the planned finished thickness. For Imperial measurements, convert thickness from inches to feet and multiply length × width × thickness to obtain cubic feet. Divide by 27 to obtain cubic yards. Use Quantity when several slabs share exactly the same dimensions.

The material calculation does not determine a structurally appropriate slab thickness, concrete strength, reinforcement, joint layout, or base preparation. Those decisions depend on loads, soil, drainage, climate, and applicable requirements. Determine the design first, then enter those finished dimensions into the calculator.

A compacted aggregate base may be part of the slab design, but it is not included in the concrete quantity. Once the required base depth is known, estimate that material separately with the Gravel Calculator.

Bagged concrete planning

How many bags of concrete do I need?

Concrete bags are sold by dry weight, but purchasing calculations rely on the mixed yield stated by the manufacturer. Choose the available bag size and the calculator divides the allowance-adjusted project volume by its typical yield. Because a partial bag cannot satisfy the remaining requirement, the result rounds upward to a whole bag.

Package yields can vary with product formulation, water content, mixing, and placement. Confirm the yield printed on the actual bag rather than assuming every product of the same weight produces the same volume. For a large bag count, compare the labor, equipment, delivery, and placement time with a ready-mix order.

Material pricing

Ready-mix concrete cost vs. bagged concrete cost

Ready-mix cost is based on the recommended cubic-yard order multiplied by the local price per cubic yard, with an optional delivery fee added separately. Bagged concrete cost is based on the required whole bags multiplied by the entered price per bag. The calculator presents these estimates independently so they are not accidentally combined.

A material-price comparison is only one part of the decision. Ready-mix quotes may include minimum quantities, short-load charges, waiting time, or distance fees. Bagged projects may require more handling, mixing labor, water access, and equipment. Enter current local prices and confirm what each quote includes before choosing a supply method.

Circular projects

Calculating concrete for columns, posts, and circular pads

Circular pads use the full diameter to calculate circular area, then multiply that area by thickness. Columns and piers use diameter and height to calculate cylindrical volume. For several identical items, enter the number in Quantity instead of manually combining their dimensions.

The Post Hole mode estimates the entire cylindrical hole as concrete and does not subtract the volume of a post. If the project requires displacement to be considered, calculate that separately and confirm the approach with the project specification. This calculator estimates material; it does not determine footing size or structural capacity.

Choosing a supply method

Ready-mix concrete vs. bagged concrete

Bagged concrete can suit repairs, post holes, small pads, and projects where a delivery truck cannot reach the placement area. It allows material to be mixed in smaller batches, but every bag must be moved, mixed consistently, and placed before the working time expires.

Ready-mix concrete can simplify larger or continuous placements because the concrete arrives mixed to the ordered specification. It requires coordinated access, forms and reinforcement prepared in advance, enough labor for placement and finishing, and a plan for any concrete remaining in the truck. Compare project scale and logistics as well as the estimated material cost.

Answers before you order

Frequently asked questions

How Much Concrete Do I Need?

Choose the project type, enter the finished dimensions and quantity, and select an appropriate allowance. The Concrete Calculator determines the measured volume, allowance-adjusted requirement, practical ready-mix order, estimated bags, weight, and optional material costs.

How Many Cubic Yards of Concrete Do I Need?

Concrete volume in cubic feet is divided by 27 to convert it to cubic yards. Enter the project measurements and the calculator performs this conversion automatically, applies the selected allowance, and rounds the ready-mix recommendation upward to a practical 0.1 cubic yard order.

How Do I Calculate Concrete for a Slab?

Multiply the slab length by its width and thickness, using compatible units. For measurements in feet and inches, convert the thickness to feet before calculating cubic feet, then divide by 27 for cubic yards. The calculator handles these conversions and can include multiple identical slabs.

How Many Bags of Concrete Do I Need?

The bag estimate divides the allowance-adjusted concrete volume by the typical yield of the selected bag size and rounds upward to a whole bag. Actual yield can vary, so confirm the coverage or yield printed on the product packaging before purchasing.

Should I Use Ready-Mix or Bagged Concrete?

Bagged concrete can be convenient for small projects and locations with limited truck access. Ready-mix is often more practical for larger placements, but suppliers may have minimum orders, short-load fees, delivery charges, and access requirements. Compare the full delivered cost and project logistics before deciding.

How Much Does Concrete Cost?

Concrete cost depends on the required quantity, local ready-mix or bag prices, delivery charges, minimum-order fees, strength or mix specifications, and site access. Enter local prices in Advanced Options to compare estimated ready-mix and bagged material costs separately.

How Much Gravel Do I Need Under a Concrete Slab?

The gravel base depends on the slab footprint, planned base depth, soil, drainage, compaction, and local construction requirements. Use the Gravel Calculator to estimate material volume after a suitable base design and depth have been determined for the site.

How Much Extra Concrete Should I Order?

Extra allowance can help cover uneven forms, subgrade variation, spillage, and measurement differences. A modest percentage is commonly used for planning, but the appropriate amount depends on the project, placement conditions, supplier increments, and the consequences of running short.

Need aggregate for the base?

Estimate gravel for your next project.